UVU Computer Science Building
This project features brutalist design. The exterior of the 4-story building is a poured in place concrete structure. This building is also connected to other existing structures via two covered walkways within the building. The building also includes a cantilevered staircase in the commons area with an 80 ft. ceiling. The construction of this massive building took about 28 months and was completed in February of 2002.
Size
196,000 Square Feet
Location
Orem, Utah
Owner
State of Utah D.F.C.M.
Architect
EFT Architects